RESOURCES
View the links below to download vendor information, compliance documentation and transmission requirements.
Become a vendor
Transmission Requirements
CCR Rule Compliance Data and Information
Having trouble viewing any of these postings?
Contact Angie Lee, Manager of Environmental Services at alee@hepn.com.
Annual Inspection Reports
Hoosier Energy Merom Area 3 Landfill – 2021 Inspection Report
Hoosier Energy Merom Area 3 Landfill – 2020 Inspection Report
Hoosier Energy Merom Area 3 Landfill – 2019 Inspection Report
Hoosier Energy Merom Area 3 Landfill – 2018 Inspection Report
Hoosier Energy Merom Area 3 Landfill – 2017 Inspection Report NP
Hoosier Energy Merom Area 3 Landfill – 2016 Inspection 1 18 2017 NP
Hoosier Energy Merom Area 3 Landfill – 2016 Inspection Report 1 15 2016 NP
Annual Fugitive Dust Control Reports
Annual Fugitive Dust Control Report – Merom 2021
Annual Fugitive Dust Control Report – Merom 2020
Annual Fugitive Dust Control Report – Merom 2019
Annual Fugitive Dust Control Report – Merom 2018
Annual Fugitive Dust Control Report – Merom 2017
Initial Annual Fugitive Dust Control Report – Merom 2016
Annual Groundwater Monitoring Reports
CCR Annual Groundwater Monitoring and Corrective Action Report – Merom Area 3 Landfill 2021
CCR Annual Groundwater Monitoring and Corrective Action Report – Merom Area 3 Landfill 2020
CCR Annual Groundwater Monitoring and Corrective Action Report – Merom Area 3 Landfill 2019
CCR Annual Groundwater Monitoring and Corrective Action Report – Merom Area 3 Landfill 2018
CCR Annual Groundwater Monitoring and Corrective Action Report – Merom Area 3 Landfill 2017
Dust Control Plan
Groundwater Monitoring and Corrective Action
Groundwater Monitoring System Certification
Groundwater Monitoring Statistical Method Selection
Landfill Design Plans
Hoosier Energy Merom Area 3 Landfill – Run-On Run-Off Control System Plan – 2021 Update
Hoosier Energy Merom Area 3 Landfill – Construction Certification for Lateral Expansion
Hoosier Energy Merom Area 3 Landfill – Design Certification for Lateral Expansion
Hoosier Energy Merom Area 3 Landfill – Closure Plan
Hoosier Energy Merom Area 3 Landfill – Post-Closure Plan
Hoosier Energy Merom Area 3 Landfill – Run-On Run-Off Control System Plan
Location Restrictions
Hoosier Energy Merom Area 3 Cell 1 Landfill – Unstable Areas Certification for Existing Landfills